Production process

Technological processes of drilling and extraction

Key technical solutions:

Ore reserves over

1,250 million tones

1,080 million tonnes

polymineral

170 million tonnes

of polyhalite

Mine depth

1,150 m

Ore production

6 – 6.5 million tonnes/year

4,0 million tonnes

polymineral

2,5 million tonnes

of polyhalite

Estimated CAPEX

600 $ million

Ore processing plant and related infrastructure

Ore processing capacity

6 - 6.5 million tonnes/year

SOP capacity

1.5 million tonnes/year

Personnel

450 people

CAPEX estimate

600 $ million

Key technical solutions:
Technology: Combined processing method for polymineral and polyhalite ores
Developed by the Institute of General and Inorganic Chemistry of the National Academy of Sciences of the Republic of Belarus
The combination of two methods — flotation and halurgy — allows for an increase in the extraction of potash minerals to 90–92% (compared to 60–65%) and the production of SOP with a purity of 95–96%
Flotation — obtaining potassium-magnesium concentrate by selective separation, dewatering and drying of potassium-containing minerals
Halurgy — ore processing based on the different solubility of minerals and subsequent crystallisation of products

Process flow diagram

Звонки принимаются с 09:00 до 18:00
Напишите нам на почту
Заявки принимаются круглосуточно
Нажимая кнопку “Отправить”, я даю свое согласие на обработку моих персональных данных, в соответствии с ФЗ от 27.07.2006 г. № 152-ФЗ “О персональных данных”, на условиях и для целей, определенных в Политике конфиденциальности.