The mine construction will be carried out according to a special project developed by highly qualified mining engineers from Russian and Belarusian design and research organizations with many years of extensive experience in designing and constructing mining enterprises
The first stage of construction involves creating of an underground mining complex (mine) for the extraction of potassium-magnesium salts at the Nivensky-I deposit, located on the production site of LLC “К-Potash Service”. This includes the construction of two shafts: a cage shaft (for hoisting personnel, materials, and equipment) and a skip shaft (for delivering ore to the surface). Shaft sinking will be carried out using mechanized methods with a specialized tunneling complex for layered excavation and removal of rock mass, which completely eliminates the use of blasting operations